POWER OVERDRIVE HYBRID f--- ACTIVATE
- Locked due to inactivity on Sep 10, '20 3:54am
Thread Topic: POWER OVERDRIVE HYBRID f--- ACTIVATE
-
COMMUNICATION RELAY DOWN AGAIN
AGH -
OK THERE WE GO
-
DAMN IT I HOPE THERE’S NO MORE SLIP UPS WE MADE
-
THE PROCESS IS DETAILED AS f---
CANNOT COST ANY MISTAKES AM I RIGHT -
The nuclear reactor is overloading, core breach imminent
-
Run
-
What is happening here
-
OVERDRIVE DETECTED
TIME TO CRACK DOWN -
INTEGRAL FUSE RELAY SWITCH OFF
-
INTEGRAL POWER SUPPLY OFF
-
What?
-
THIS CANNOT BE HAPPENING
-
IT’S FAILING RIGHT BEFORE OUR EYES
NEVER THOUGHT THIS DAY WOULD COME -
Huh?
-
KEEP CALM
WE CAN FIX THIS s---
This thread is locked, therefore no new posts can be made.